Project objective:
The aim of the project was the modernisation of the Southern railway bridge over the Danube at hm section 82+94 of the Budapest - Hegyeshalom railway line No. 1.
After the required modifications in the substructure, the project involved the construction of an entirely new superstructure on the northern side of the bridge (between Rákóczi bridge and the existing railway bridge), including the related track construction between Nádorkert and Soroksári street.
Two new single-track superstructures were built after the demolition of existing ones.
As required by the National Railway Co., MÁV Zrt, the reconstruction had to be carried out with the least possible disruption to traffic, with the nearly continuous maintenance of double-track rail traffic.
Axle load after the reconstruction is 225 kN.
The planned speed of the line section is 100 km/h.
Other infrastructures were also refurbished to ensure the completeness of the project
(interlocking, train control system, telecommunication, overhead line, noise barrier walls, utilities, etc..)
Project completed: 30 September 2022
Investment value: HUF 37,925,000,000
During the project, our company provided project management, performed project execution tasks and provided a part of specialised construction supervisors.