Construction supervision activity related to the establishment of an international research centre.
Project objective:
Project location: Szeged, Science Park. ELI is the first civilian large-scale high-power laser research facility realised with trans-European cooperation and the participation of the international scientific community. The establishment of the research centre created new research fields in physics. It can also have a significant impact in several areas of material science, medicine and environment protection as well.
The building was constructed in an area specially prepared and adjusted for this purpose. The project also involved the construction of the entire utility and road network. The total constructed net floor area is 24,400 m2, divided between five buildings. Building “A” has the most important research functions, containing laser halls suitable for hosting five laser equipment using attosecond sources and experimental areas with clean room design where the interaction of light and material can be analysed at higher intensities than ever before.
The project was completed in 2018. 85% of the investment was financed by the scientific development fund of the European Union and 15% from the central budget of the Hungarian State.
Project completed: March 2018
Investment value: Confidential
ECO-TEC Ltd. was assigned with the construction supervision of project execution as a member of a Consortium formed by engineer offices. In the frame of this assignment, in addition to site inspections of the construction, we participated in the monthly technical and financial reports in compliance with European Union standards and it was also our task to prepare the Final report of the Project together with other consortium members.




