Cost analyst tasks related to the construction of MOL Plc.’s new headquarters.
Project objective:
This is the tallest building in Budapest with 30 floors above ground level, 120 m height, with a total of 66,000 m2 floor area above and 30,000 m2 below ground level. According to the concept elaborated with the cooperation of the world-famous London architectural design studio, the tower building is a symbol of Budapest’s 21st century development.
The designer of the project was Foster&Partners (UK), in cooperation with Finta Stúdió.
ECO-TEC Ltd. was assigned with cost analyst (Quantity surveying) and cost estimation tasks with using the documentation of the tender plan phase. In the frame of the assignment, our task was to provide opinion and pricing for the non-priced budget announcement which is the basic document of tendering.
There was less than 8% difference in the prices of the general cost estimation prepared by ECO-TEC Ltd. and the general contract concluded at the end of the tendering process.
Project completed: 2023.
Investment value: Confidential