Construction supervisor and project management services related to the refurbishment of Békéscsaba station
Project objective:
Compliance with the requirements of a 120 km/h speed and 225kN axial load railway line in terms of the plain lines and the run-through tracks of the station; reinforcement, upgrading or partial refurbishment of the substructure, superstructure and the overhead line network as well as the load-bearing railway structures on the plain line and in the station.
The construction investment involved approximately 25 km railway track and 20 km overhead line.
The refurbishment included the renovation and complete reconstruction of the listed historical station building. The project covered the construction of a road-railway fly-over structure, a pedestrian tunnel and road connections as well as the execution of road and utility construction works and building engineering (HVAC engineering, outdoor lift) works.
As a result of the project, the track network, the overhead line network, the area lighting, the cable substructure and the electric traction substation of Békéscsaba railway station have been refurbished, and new rainwater drainage and noise protection systems have been installed. A pedestrian underpass and new elevated platforms were built at the station. In connection with the project, the Orosházi street overpass and the connecting road junctions on both sides have been reconstructed. P+R parking lots and B+R racks and new service roads were built in front of the station.
Project completed: 31 May 2016
Investment value: HUF 29,354,363,540
During the project, our Company has been assigned with project management, execution direction tasks and provided the majority of construction supervisors in the specialised fields. Our activities also included cost control and quantity surveying tasks, as well as the certification of the Contractor‘s monthly and overall performance.